10th May 2004: After three weeks on site, Albert Soden (the contractor) are still swimming round in mud

21st May 2004: With most of the foundations now in, the first block is laid by Andrew Jones, the Pastor.

27th May 2004: Most blockwork is now up to floor level, and parts are at window cill height

27th May 2004: The timber floor joists have started to be installed, along with the first pieces of scaffolding